How to Integrate Electronic Shelf Labels with Your ERP and POS

By Keonex Editorial ·

To integrate electronic shelf labels with an ERP and POS, pick one system that owns the price, have the label platform receive it (by events or by scheduled polling), reconcile what each label shows against what the till charges, and do not start until the catalogue's barcodes are clean. Everything else is detailed engineering.

This guide follows the order in which a project usually unfolds: which systems are involved, how data travels, which architectural decisions matter most, what almost always goes wrong, and how to test before the first store goes live. It does not describe a specific product. What Keonex sells as a product is on its platform page. For what an electronic shelf label is and what it costs, etiquetaselectronicas.io is the reference site published by Keonex (in Spanish).

Map the systems before drawing arrows

An integration project starts with a sheet listing every system that touches price, not with the label platform. A mid-sized chain typically runs four families, and each has strengths and limits worth knowing.

SystemWhat it providesWhat usually limits it
ERP or merchandising systemCatalogue, price lists, costs, often promotionsMany expose data as a nightly export, not an online API
POS or till softwareThe price actually charged, offers applied at checkoutEach store may run its own local database, on different versions
E-commerce platformOnline price, available stock, sometimes channel pricesIts change cycle is the web team's, not the store's
PIM, promotion manager or pricing enginePrice rules by store, region or segmentMay not exist; a spreadsheet often does the job

The awkward question is which of them has the last word. In some companies the ERP sets the list price but the POS applies its own discounts, so the label and the receipt disagree and nobody decided that they should. Before connecting anything, write down who creates a price, who approves it, who may change it in store, and how overlapping offers are prioritised.

One source of truth for price

The rule that prevents the most trouble: every piece of price data has exactly one origin, and every other system receives it from there. The label platform must not become a second place where price is edited because it is more convenient. Once it does, there are two truths, and within months nobody knows which one wins.

That does not make the platform a silent mailbox. Some things belong to it, not to the ERP:

  • Which physical label is linked to which product and which shelf position.
  • The state of each label (battery, last contact, update errors).
  • Scheduled changes over time, with their history.
  • The graphic template: what is drawn besides the price.

Price, item name, unit of measure and commercial attributes come from outside. If the company later wants different prices per store or per time slot, that logic belongs where price is already managed, not in a rule hidden inside the label platform. For two channels sharing a product, there are specific conflict rules, covered in the article on syncing prices between web shop and physical store.

What travels with the price

A price alone does not make a useful label. A minimal flow usually carries:

  1. Item identifier (internal code and barcode).
  2. A short description that fits the label width.
  3. Selling price including tax.
  4. Unit price and its unit (kilo, litre, metre), where applicable.
  5. Previous price and dates, if there is a promotion.
  6. Optional attributes: origin, pack size, allergens, loyalty points, stock.

Every extra field is another column to maintain and another source of errors. Starting with the first six and widening once the basic flow is stable is safer than adding everything up front.

Push or pull: how the data moves

There are two basic mechanisms, and most projects end up using a mix.

Push. The source system announces each change: an API call, a message on a queue or a webhook. It reacts quickly and loads the network lightly, but it requires the ERP or pricing engine to emit those notifications reliably, and someone must own retries when the receiver does not answer.

Pull. The platform asks at intervals: it reads a database view, downloads a file over SFTP or calls an API with a "changed since" marker. It is simpler to build on older systems and tolerates a source that cannot notify, at the cost of a latency set by the interval and of having to detect what changed by comparing with the previous state.

CriterionPushPull
LatencyLow, depends on the source processEqual to the polling interval
Demand on the ERPMust emit reliable eventsMust expose a stable view or file
Typical riskLost events without retriesPartial reads of a file still being written
Best forUrgent changes and dynamic pricingDaily price lists and legacy systems

Whichever you choose, two safeguards are not negotiable. The first is that operations are idempotent: receiving the same change twice must give the same result as receiving it once. The second is a periodic reconciliation: a process that compares the source price with what each label shows and corrects differences. Events get lost, files arrive truncated and people touch things; reconciliation is what stops those accidents from piling up.

Batch or real time

Latency is better answered with use cases than with adjectives.

  • Weekly or daily price list change. A nightly batch is enough. The real requirement is to finish before opening, with room to rerun if something fails.
  • Promotion with fixed start and end. Schedule it ahead in the platform and let it fire at the set time, with no ERP involvement at that moment. It is more robust than a manual change at six in the morning.
  • Dynamic price or short-dated markdown. Here you do need a short event chain, because the value lies in the price changing during the day.
  • Parity with the web shop. If the online shop and the shelf must show the same thing, the acceptable delay is a business decision, to be taken with whoever runs e-commerce.

The link between platform and labels is another layer. Between server and label sit base stations or access points, and radio has its own pace; thousands of labels do not update instantly one by one. There is also an open specification, the Bluetooth SIG's Electronic Shelf Label Profile 1.0, which defines how a client controls and updates labels over Bluetooth; which protocol each manufacturer uses is a hardware decision studied separately. For the ERP integration, what matters is different: the platform must be able to say which changes are pending, which are confirmed and which failed. Without that visibility, "real time" is a promise nobody can check.

Master data decides the project

In practice most of the effort goes into the catalogue. A label is tied to a product by an identifier, and nearly always that identifier is the barcode. The common retail ones are GTINs, in 8, 12, 13 and 14-digit formats according to GS1; the EAN-13 is the most common on European shelves.

The problems that keep appearing:

  • Products without a code or with internal codes (fresh, loose goods, private label). An identification scheme must be chosen and maintained.
  • Several codes for one item: old formats, promotional packs, supplier changes. The label must know which one it links to and how the others resolve.
  • One code for several items: it happens more than people admit and makes two products share a label or overwrite each other.
  • Long descriptions or odd characters that do not fit or render badly on a small display.
  • Missing or inconsistent unit of measure, which prevents computing a price per kilo or per litre.
  • Tax-inclusive prices set up differently across ERP, POS and web.

A catalogue audit up front, counting items without codes, duplicates and descriptions out of length, saves weeks later. Do it before committing to dates, and on a sample from several stores rather than the central catalogue, because local data is usually worse.

Price indication rules: what the architecture must support

Integration does not deliver compliance on its own, but it can make compliance easy or impossible to show. Two EU rules bear directly on the design; national law transposes them, so check the rules of each country you operate in.

The first is the unit price. Directive 98/6/EC requires products offered to consumers to carry both the selling price and the unit price, the final price including tax for one kilogram, one litre or another reference unit. The system therefore needs the unit and quantity as master data, and the label template must be able to show them when they apply.

The second is announcing price reductions. The Omnibus Directive added to the price indication framework the requirement that, when a reduction is announced, the prior price is the lowest applied during a period of at least 30 days before the reduction. Proving it takes a reliable price history per item and store. If the ERP keeps it, the label platform must respect it; if not, someone has to store it. Have the exact text and its national transposition reviewed by legal counsel before fixing business rules: this guide describes an architecture and is not legal advice.

One practical point: the most useful control is a match check. If the label says 2.49 and the till charges 2.59, the problem is as much about customer trust as about compliance. A daily reconciliation between the two exposes that risk before a customer does.

When the store network goes down

A well-built integration assumes the link between store and central system will drop. That drives two decisions: where the queue of pending changes lives, and what happens to a promotion scheduled to start during the outage. The answer depends on whether the platform or a local gateway can run autonomously and reconcile afterwards. Before choosing a vendor, ask to see what a store shows during a one-hour outage and what happens when the link returns. The point here is that tolerance to outages is a requirement of the integration design from the start, not an "improvements" phase later.

Security and permissions

The credentials the platform uses to read from the ERP or write to the POS are a sensitive spot. Common-sense rules: dedicated service accounts with the least privilege, read-only access where reading is enough, secret rotation, a log of who changed what, and separate test and production environments. Integrations that write back (for example to confirm a change to the ERP) deserve extra review. The generic requirements any platform should meet are in the guide to what electronic shelf label software should offer.

How to test an integration

Most integration defects do not surface in the happy-path test but in edge cases. A reasonable plan includes:

  1. A test environment with representative data. A copy of the catalogue with its real structure, free of personal or confidential data.
  2. Price cases. Simple change, scheduled change, markdown with prior price, item with unit price, item with no barcode.
  3. Failure cases. Source system unavailable, truncated file, duplicate message, out-of-order message, label with a flat battery.
  4. Volume. A mass change of a store's whole catalogue, measured end to end.
  5. Reconciliation. Create divergences on purpose and check the system detects and corrects them.
  6. A pilot in a real store, with someone on the shop floor comparing label and till for several days.

A useful acceptance criterion is measurable: the percentage of labels matching the POS after a change, and the maximum time from source change to confirmation. Each company sets its own thresholds; what matters is agreeing them beforehand.

Typical project phases

The phases below describe a common sequence and are not any vendor's commitment. Timelines vary too much with the state of the systems to give an honest figure in the abstract.

PhaseExpected outcomeWho carries most weight
DiscoverySystem map, price source of truth, latency requirementsClient operations and IT
Master data auditCatalogue quality report and clean-up planClient catalogue team
Integration designFlows, mechanism (push or pull), conflict rules, securityBoth parties
Build in testConnectors working against the test environmentVendor and integrator
PilotOne or a few stores with daily label-to-till comparisonPilot store
Rollout in wavesGroups of stores, with agreed change windowsOperations and vendor
OperationMonitoring, reconciliation, incident handlingClient IT

The bottleneck is almost never mounting the labels. It is getting ERP access at the right moment, cleaning the catalogue and agreeing who approves each rule change.

Common mistakes

  • Starting with hardware and leaving integration for last.
  • Letting the label platform become a second place to edit price.
  • Measuring success by labels installed instead of the percentage that match the till.
  • Skipping reconciliation and trusting that no event will be lost.
  • Ignoring the web shop until someone notices a different price online.
  • Not documenting who may change price in store.

Next step

If you are in discovery, gather three things before talking to vendors: the diagram of price systems with an owner for each, a catalogue sample showing the state of codes and descriptions, and your most demanding latency case. With those, any technical conversation gets far more concrete. To discuss your scenario with the Keonex team, write via the contact page. If what you need now is to earn from the screens as well as manage price, continue with the guide to in-store retail media.

Frequently asked questions

Do I need to replace my ERP to install electronic shelf labels?

Not necessarily. The label platform connects to the systems you already run. It only needs one of them to be the source of truth for price and to expose that data through an API, a database view or a file. What usually does need work is the master data, above all barcodes.

Should the ERP push prices, or should the platform pull them?

It depends on what the source system can do. If it can announce every change, event-driven push means lower latency and less load. If it cannot, the platform polls at intervals and diffs against what it already holds. Many projects combine both: events for urgent changes and a periodic reconciliation that corrects drift.

Do I need real-time price updates?

For most scheduled price changes, no. The label only has to be correct before the store opens or the promotion starts. Near-real-time is justified for dynamic pricing, markdowns on short-dated stock, or channels where the online and in-store price must match to the minute.

How long does an integration take?

No honest figure exists without knowing the systems. The schedule is driven by master data quality, the number of price sources, the access the ERP team grants and each store's change windows, more than by mounting the labels. Ask for a timeline per phase, not one global date.

What must the system do to respect price indication rules?

What the label shows must match what the POS charges, the unit price must be displayable where it applies, and a price history must exist to prove the prior price on markdowns. The architecture should keep that history from day one.

Sources

  1. Directive 98/6/EC on consumer protection in the indication of the prices of products offered to consumers (consolidated text, EUR-Lex)
  2. Directive (EU) 2019/2161 (Omnibus Directive), which adds Article 6a on price reduction announcements to Directive 98/6/EC (EUR-Lex)
  3. Bluetooth SIG: Electronic Shelf Label Profile 1.0
  4. GS1: GTIN (Global Trade Item Number)
How to Integrate Electronic Shelf Labels with ERP and POS